Hi tonylee1988,
Strictly speaking an extension lead is only ever considered to be a temporary measure, for a long-term connection the relevant regulations would expect an SWA cable to be installed with proper connection to the main distribution board (or suitable donor circuit) and an appropriate hard-wired socket at the other end.
Answered by: Nexus Technical Team
Date published: 2020-07-29